Hello again from Zuckerman Homes.

If you’ve driven down Livingston Road lately, in either direction, we hope our two entry features caught your eye. The gatehouse was recently painted and is approaching the end of its construction phase, and our entry wall, which will have a dramatic waterfall, is like a giant calling card inviting you to stop by.

But, it’s what you don’t see from the road that we’d like to tell you about.

Besides our three spectacular models many homes are now under construction throughout the community. This means our first residents will be moving into their new homes in early 2016. That’ll be an exciting time for them – and another milestone for Sienna Reserve.

The start of construction on those homes was made possible due to the completion of our road system. By the way, portions of the roads in Sienna Reserve are accented with brick pavers – over 35,000 square feet of pavers to be exact. It’s quite the sight.

We’re also happy to let you know the first of several fountains is also in place in the middle of the first roundabout. It’s not running with water just yet, nor has the landscaping surrounding its base been planted, but it’s still pretty impressive.

So the next time your driving by, don’t just admire our entry gatehouse and wall from Livingston Road, pull on in and take a look at everything that’s happening.
Once inside the community be sure to stop at the sales center and meet with the Sienna Reserve team. They’d be more than happy to show you around. You just might be surprised by everything that’s going on – and up.

The sales center is open Monday-Saturday, 10am to 6pm, and on Sunday, 11am to 6pm.

We’ll see you soon.

promo

Comments are closed.

P: 239-643-4333 E: info@zuckermanhomes.com